EVM (NC) (65 bar MWP)

Product number: 027B1120
PLEASE LOGIN TO SEE PRICES
Product Group : Industrial Controls - Pressure Regulators
Description
EVM PILOT VALVE NC MU 20
Product Group : Industrial Controls - Pressure Regulators
Family : ICS + EVM
Coil : No
Connection Type : Thread Inlet Type : Thread
Function : NC Model Number : 027B1120
Type : EVM NC
Kv Value : 0.280 m³/h
Commodity Code : 84818079 Country Of Origin : POL
EAN : 5702422007128 Gross Weight : 0.252 kg
Body Material : Steel
Net Weight : 0.25 kg
Max OPD, 10W AC : 21 Bar Max Operating Pressure : 65.0 Bar
Refrigerant : R22, R134a, R401A, R402A, R404A, R407A, R407B, R407C, R407F, R409A, R410A, R421A, R502, R507A, R717, R744
Approval : EAC, LLC CDC TYSK
Ambient Temperature Range : -40-80 °C Medium Temperature Range : -60-120 °C
Actuator Size : 13.5 mm CV Value : 0.324 gal/min
Direction : None Orifice Size : 3.30 mm
Valve Operation : SERVO-PISTON